Question:
Re: CQD answer published Wednesday, November 30, 2016 - Rough Inspection Connections
My answer to the question is always found in 250.4(A)(5). The inspector must be able to verify that the installation complies with this section (as well as many others). Therefore, all equipment grounding conductors splices must be completed for the Rough inspection.
J Grant Hammett
A
Answer:
Hey Grant thanks for your comment. You make a good additional point. If the inspector can't verify that the bonding and grounding connections are made the chances of one of more of them getting missed is more likely. Trying to see the connections after all the devices are installed would be much more difficult.